Schedule Risk Evaluation and Control Countermeasures for Supporting Infrastructure Projects of Large-Scale Equipment based on ISM-BN

Dong Nie
Frontiers in Economics and Management, (2026), Vol.7, No.6, pp.41-48
Published: June 11, 2026
DOI: 10.6981/FEM.202606_7(6).0006
PDF: Download Full Text PDF
Abstract

To address the issues of vague schedule risk identification, insufficient quantitative research, and poorly targeted control measures in supporting infrastructure projects for large-scale equipment, this paper takes the perspective of the owner (the construction unit) as the starting point. Through expert interviews, a set of risk factors for such projects is identified and established. Using Interpretive Structural Modeling (ISM), the hierarchical relationships and propagation paths of schedule risks are revealed. A Bayesian Network (BN) model is then constructed for quantitative analysis to identify key risk nodes and causal chains, and to determine and classify schedule risk levels. Based on a comprehensive evaluation, targeted risk control measures are proposed, providing a reference for the owner's schedule management.

Keywords: Large-scale Equipment Supporting Infrastructure Projects; Owner's Perspective; Schedule Risk Control; ISM-BN.
APA Citation: Dong Nie (2026). Schedule Risk Evaluation and Control Countermeasures for Supporting Infrastructure Projects of Large-Scale Equipment based on ISM-BN. Frontiers in Economics and Management, 7(6), 41-48. https://doi.org/10.6981/FEM.202606_7(6).0006

References

  1. Gou, Q. Y., Deng, M. Q., Hu, K. K., et al. (2024). Construction of a risk evaluation index system for radar site engineering construction based on grey-rough set. Project Management Technology, 22(11), 102–107.
  2. Zhang, X. F., Wu, S. L., & Liu, Z. F. (2018). Study on the construction and evaluation of position engineering on the China-India border. Engineering and Technological Research, (4), 199–200.
  3. Du, M. Y. (2025). Optimization of penetrating schedule control for construction projects from the owner's perspective. Urban Development, (20), 100–102.
  4. Chen, X. N. (2025). Analysis of difficulties and innovative strategies in project management from the owner's perspective. Create Living, (9), 193–195.
  5. Zhang, J. (2025). Research on construction site management of primary and secondary school buildings from the owner's perspective. China Construction, (7), 20–22.
  6. Zhao, B., & Zhong, C. L. (2022). Research on influencing factors of schedule control of prefabricated buildings based on ISM. Journal of Jilin Jianzhu University, 39(6), 56–64.
  7. Chen, J., Zhao, P. W., Zhang, M. K., et al. (2022). Research on influencing factors of university infrastructure project schedule based on ISM model. Construction Economy, 43(S1), 337–341.
  8. Chen, N. (2015). ISM analysis of factors influencing project schedule. Technology Innovation and Application, (23), 274.
  9. Cai, Z. L., Zhang, K., Li, B., et al. (2022). Research on schedule risk management in the renovation of old residential high-rise buildings based on Bayesian network. Construction Economy, 43(11), 60–66.
  10. Chen, Y., Jin, R., & Zha, Y. C. (2022). Research on delay risk of large complex public projects based on Bayesian network. Journal of Zhengzhou University (Engineering Science), 43(2), 91–97.
  11. Lin, Z. Z. (2025). Research on schedule risk management of housing construction project based on Bayesian network. Fujian Construction, (6), 107–110.
© 2026 eLibrary · Stand on the shoulders of giants